Recalibration of IRIS/IDA sensors

Calibration schedule

The table below records when the most recent calibrations took place. The second column indicates when the last random binary calibration of the primary sensor was executed and the third column, when it is next due. This column is color coded red if the calibration is past due. Columns four and five similarly represent the same information for the secondary sensor. The random binary test can fail if the sensor is inoperable or if there is a defect in the local network topology preventing the calibration signal from reaching the sensor. The last column indicates whether the sensor sensitivity has been checked by co-recording with a portable reference instrument.

This table was last updated on Wed Apr 24 10:35:04 UTC 2024

Primary sensor Secondary sensor Absolute
Station Last RB cal Next due Last RB cal Next due Last Calibration
AAK 2024:071 2025:071 2024:071 2025:071 2014:263
ABPO 2024:066 2025:066 2024:066 2025:066 2010:279
ALE 2023:136 2024:136 2023:135 2024:135 2014:147
ARTI 2023:079 2024:079 2024:059 2025:059 n/a
ASCN 2024:076 2025:076 2023:074 2024:074 2022:067
BFO 2013:064 2014:064 2022:143 2023:143 2011:013
BORG 2024:023 2025:023 2024:023 2025:023 2018:211
BORK 2023:142 2024:142 2023:140 2024:140 n/a
CMLA 2024:103 2025:103 2024:103 2025:103 2019:159
COCO 2023:107 2024:107 2023:107 2024:107 2018:082
DGAR 2023:160 2024:160 2023:159 2024:159 2016:345
EFI 2024:100 2025:100 2024:100 2025:100 2018:062
ERM 2023:280 2024:280 2023:279 2024:279 2015:240
ESK 2024:061 2025:061 2024:061 2025:061 2015:011
FFC 2024:077 2025:077 2024:076 2025:076 2016:189
HOPE 2024:101 2025:101 2024:101 2025:101 2015:019
JTS 2024:085 2025:085 2024:085 2025:085 2019:163
JZAX 2024:100 2025:100 2024:099 2025:099 n/a
KAPI 2024:031 2025:031 2024:031 2025:031 2018:317
KDAK 2024:073 2025:073 2024:073 2025:073 2017:230
KIV 2023:345 2024:345 2023:342 2024:342 n/a
KURK 2023:270 2024:270 2023:269 2024:269 2011:162
KWJN 2023:270 2024:270 2023:271 2024:271 2017:217
LVZ 2023:348 2024:348 2023:341 2024:341 n/a
MBAR 2023:109 2024:109 2024:113 2025:113 2019:268
MSEY 2023:185 2024:185 2023:195 2024:195 2011:210
MSVF 2024:099 2025:099 2024:099 2025:099 2015:156
NIL 2020:239 2021:239 2023:275 2024:275 n/a
NNA 2024:012 2025:012 2024:011 2025:011 2015:237
OBN 2023:152 2024:152 2023:151 2024:151 n/a
PALK 2024:064 2025:064 2024:064 2025:064 2019:131
PFO 2023:152 2024:152 2023:152 2024:152 2016:051
RAYN 2024:064 2025:064 2023:062 2024:062 2018:026
RPN 2022:180 2023:180 2024:017 2025:017 2011:103
SACV 2024:104 2025:104 2024:103 2025:103 2017:318
SHEL 2023:272 2024:272 2023:272 2024:272 2013:234
SIMI 2023:163 2024:163 n/a n/a 2016:283
SUR 2024:022 2025:022 2024:022 2025:022 2010:176
TAU 2024:040 2025:040 2024:040 2025:040 2015:025
TLY 2024:101 2025:101 2013:030 2014:030 n/a
UOSS 2023:304 2024:304 2023:304 2024:304 2017:260
WRAB 2023:290 2024:290 2023:289 2024:289 2019:273